Fraud: SIM Swap & Beyond · Chapter 4 of 4
Post-incident review
A blameless review template for OTP fraud and delivery incidents, and turning findings into controls.
8 min read
Incidents will happen: a pumping wave, a SIM-swap takeover, a delivery outage in a key market. The review afterwards decides whether the same thing happens again. Run it blameless, run it within a week, and end it with owned, dated actions.
A template
- Summary — two sentences a non-engineer understands.
- Impact — users affected, money lost, duration, markets.
- Timeline — first signal, detection, response, resolution, with timestamps.
- Detection — which alert fired, or why none did.
- Contributing factors — technical, process, and vendor.
- What went well — so you keep doing it.
- Actions — each with an owner and a date.
Questions that find the real gaps
- How long between the first anomalous send and the first human looking at it?
- Which control was supposed to stop this, and why didn't it?
- Could the kill switch have been used earlier? Did the on-call engineer know it existed?
- For takeovers: which ceremony was used, and was the action correctly classified as high-risk?